TATA PROJECTS
- Tender Engineering support with preparation of LAYOUT & BOQ for 400kV GIS SILLA Substation of GCC INTERCONNECTION PROJECT PHASE 3, Abu Dhabi (UAE).
- Providing Pre-bid engineering and estimation of BOQ for the Lot items of the Project ”KAHRAMAA Phase IX for Packages S-2-2, S-4, S-6 and S-7” for Electrical & Civil, total is 17 Stations.
VATECH , SAUDI ARABIA
Control & Relay panel Engineering for 132kV S/S 8067
DEUTSCHE ENERGIE – CONSULT GMBH. ABU DHAB
Base design package for 400/220kV GIS SUBSTION for TRANSCO, Abu Dhabi (UAE).
SIEMENS, QATOR
Remote End Scheme modification using Siemens Relays.
DUBAI COOLING POWER PLANT
Electrical Modification work.
Projects IN SUDAN:
PETRO-ENERGY CO
Supplying OHL materials for Petro-Energy through Ram energy (OHL Materials)
PETRO-ENERGY CO
Supplying OHL materials for Petro-Energy through Ram energy ( Pin Insulator & ACSR Conductors,..)
CIVIL AVIATION AUTHORITY
Supplying, Installation and testing Motor Operator 220/250 VAC DMX2500, Closing Coil 220/250 VAC DMX2500, Under Voltage Coil 220/250 VAC DMX2500
Mohan energy-Sudan
7 of our best Testing & Commissioning, Erection of Power plant and Relaying Engineers are worked with Mohan energy in Sudan Projects.
Anglique co., - Sudan
5 of our best of transmission line erection, Testing & Commissioning, Relaynf and civil Engineers are working with Anglique Co., in Singa-Hawata-El Gadariff.
Al Salam Cement Factory-Atbara :
5 Erection, controlling, Instrumentation Engineers Working with Al Salam Cement Factory – Atbara
Ram-Energy : (WIP) Supplying of Cross arms and Supports
|